Do not back fill around snorkel. A
clearance of at least 4" (102 mm) must be
maintained between the snorkel and the
soil.
If the foundation is recessed, use recess brackets (not
supplied) for securing lower portion of the snorkel.
Fasten brackets to wall first, then secure to snorkel
with self drilling #8 x 1/2 sheet metal screws. It will be
necessary to extend vent pipes out as far as protruding
wall face. (Fig. 35)
Foundation Recess
Recess Brackets
Watertight Seal
Around Pipe
Fig. 35 Snorkel installation, recessed foundation.
BG401
Vertical Through-the-Roof Applications
Snorkel
This Gas Fireplace has been approved for:
2/10/99 djt
1. Vertical installations up to 40' (12 m) in height. Up to
10' (3 m) horizontal vent run can be installed within
the vent system using a maximum of three 90°
elbows.
2. Up to two 45° elbows may be used within the
horizontal run. For each 45° elbow used on the
horizontal level the maximum horizontal length must
be reduced by 18" (457 mm).
Minimum
8' (2.4 m) /
Maximum
40' (12 m) Vertical
Rise
Fig. 36 Support straps for horizontal runs.
CFM148
20012253
Snorkel
Wall Screws
Sheet Metal
Screws
BG401
Maximum
10'
(3 m)
Pipe Straps Every
3' (914 mm)
CFM148
CDVX Series Direct Vent Gas Fireplace
Example: Maximum horizontal length
0 x 45° elbows = 10' (3 m)
1 x 45° elbows = 8¹⁄₂' (2.6 m)
2 x 45° elbows = 7' (2.1 m)
3. A minimum of an 8' vertical rise.
4. Two sets of 45° elbows offsets within these vertical
installations. From 0 to a maximum of 8' (2.4 m) of
vent pipe can be used between elbows. (Fig. 37)
5. 7DVCS must be used to support offsets. (Fig. 36)
This application will require that you first determine
the roof pitch and use the appropriate 7DVSKV (A, B
or F). (Refer to Venting Components List, Page 27)
Max.
8'
(2.4 m)
45°
Max.
8'
(2.4 m)
45°
Typical Offset Installation
Fig. 37 Typical vertical roof applications.
FP1021
Vertical Through-the-Roof Installation
Typical vertical
through the roof
1. Locate your fireplace.
application
2. Plumb to center of the (4") flue collar from ceiling
3/26/00 djt
above and mark position.
3. Cut opening equal to 9³⁄₈" x 9³⁄₈" (240 x 240
mm). 10³⁄₈" x 9³⁄₈" (264 x 240 mm) when using
7TCRVT1320.
4. Proceed to plumb for additional openings through
the roof. In all cases, the opening must provide a
minimum of 1 inch clearance to the vent pipe, i.e.,
the hole must be at least 9³⁄₈" x 9³⁄₈" (240 x 240 mm).
5. Place fireplace into position.
6. Place firestop(s) #7DVFS or Attic Insulation Shield
#7DVAIS into position and secure. (Fig. 38)
Typical
Ceiling
50'
Support
(15 m)
Application
Typical Roof
Support Ap-
plication
FP1021