Vent Clearances and Framing
A. Pipe Clearances to Combustibles
WARNING! Risk of Fire! Maintain air space clearance
to vent. DO NOT pack insulation or other combustibles:
• Between ceiling firestops
• Between wall shield firestops
• Around vent system
Failure to keep insulation or other material away from
vent pipe may cause over heating and fire.
Note: Heat shields MUST overlap by a minimum 3,8 cm.
• SLP heat shield - designed to be used on a wall 11,1 cm to 19,4 cm thick.
• If wall thickness is less than 11,1 cm the existing heat shields must be field tricmed.
If wall thickness is greater than 19,4 cm a DVP-HSM-B will be required.
Heat
Shield
7,6 cm
top clearance
2,5 cm
clearance around
vertical sections
Figure 8.1 Horizontal Venting Clearances To Combustible
Materials
7,6 cm
top clearance
Heat
Shield
2,5 cm
clearance
Wall
bottom & sides
Shield
Firestop
WALL
Heat & Glo • SOHO-B-CEB, SOHO-N-CEB, SOHO-P-CEB • 2111-980 Rev. i • 3/13
B. Wall Penetration Framing
Combustible Wall Penetration
Whenever a combustible wall is penetrated, you must
frame a hole for the wall shield firestop(s). The wall shield
firestop maintains minimum clearances and prevents cold
air infiltration.
• The opening must be framed on all four sides using the
same size framing materials as those used in the wall
construction.
• SLP pipe - A wall shield firestop must be placed on each
side of an interior wall. A minimum 1-1/2 inch (3,8 cm)
overlap of attached heat shields must be maintained.
• See Section 10.G for information for regarding the in-
stallation of a horizontal termination cap.
Non-Combustible Wall Penetration
If the hole being penetrated is surrounded by noncom-
bustible materials such as concrete, a hole with diameter
one inch greater than the pipe is acceptable.
Whenever a non-combustible wall is penetrated, the wall
shield firestop is only required on one side and no heat
shield is necessary.
10 in.
(25,4 cm)
A
A*
97,1 cm
* Shows center of flue framing hole. The center of the hole is 2,54 cm
above the center of the horizontal flue pipe.
Figure 8.2 Wall Penetration
B
10 in.
(25,4 cm)
B
94,6 cm
31

Advertisement

Table of Contents
loading

This manual is also suitable for:

Soho-n-cebSoho-p-ceb

Table of Contents