Figure 3 Product components
1 Particle counter with power cord
2 Cleaning solution
Installation
Multiple hazards. Only qualified personnel must conduct the tasks described in this section of the
document.
Installation guidelines
Install the instrument:
• As near the sample source as possible to decrease analysis delay
• In a clean, dry, well ventilated and temperature controlled location
• In a location with minimum vibrations that has no direct exposure to sunlight
• In an environmental enclosure that supplies protection from precipitation and direct sunlight, good
ventilation and temperature control if installed outdoors
• In a location where the power switch and power cord are visible and easily accessible
• In a location where there is sufficient clearance around it to make plumbing and electrical
connections
Mechanical installation
Attach the instrument to the wall
Personal injury hazard. Make sure that the wall mounting is able to hold 4 times the weight of the
equipment.
8 English
3 Cleaning brush
W A R N I N G
W A R N I N G