Griddle Assembly - GE Monogram ZDP486ND Technical Service Manual

Professional range and rangetops
Hide thumbs Also See for Monogram ZDP486ND:
Table of Contents

Advertisement

Griddle Assembly

Note: The following describes the procedure to
remove the griddle assembly.
To remove the griddle assembly:
1.
Remove griddle fl ue cover and grease trough.
2.
Remove the (inner) clamping screws.
Note: It's recommended to remove the griddle
completely when servicing the burner assembly.
The griddle control has a capillary that is positioned
securely to the underside of the griddle by a retainer
that is attached with 2 Phillips-head screws.
3. Push the griddle toward the back of the range to
release tabs from slots on the front of the range.
Front of Range
Tab
Slot
Caution: The griddle is heavy. Use care when lifting
and rotating the griddle to prevent damage to the
capillary.
4. Lift and rotate the griddle and remove the 2
Phillips-head screws and the retainer from the
bottom of the griddle.
Retainer
Capillary
Note: When installing the retainer, ensure the
capillary is in direct contact with the bottom of the
griddle.
5. Remove the two 1/4-in. hex-head screws from
the back of the grill burner.
– 35 –
(Continued next page)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents