Setup And Operation - AEG Protect Home Operating Instructions Manual

Table of Contents

Advertisement

5
Set-Up and Operation
Installing the UPS is as easy as following the steps shown.
5.1
Inspection
Remove the UPS from its packaging and inspect it for
damage that may have occurred during shipping. If any
damage is discovered, repack the unit and return it to the
place of purchase.
5.2
Placement
Install the UPS unit in any protected environment that
provides adequate airflow around the unit which is free
from excessive dust, corrosive fumes and conductive
contaminants.
Do not use the UPS in environments with high temperatures
or humidity.
5.3
Charging
The PROTECT HOME is shipped from the factory with its
internal battery fully charged, however, some power may be
lost during shipping and the battery should be recharged prior
to use. Plug the unit into an appropriate power supply and
allow the UPS to charge fully by leaving it plugged in for at
least 8 to 10 hours with no load (no electrical devices such as
computers, monitors, etc.).
14

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents