Hitachi C 12FSA Technical Data And Service Manual page 33

Slide compound saw
Table of Contents

Advertisement

(4) How to install packings (A) and (D)
Put packing (D) in the U-shaped groove of the base packing in the carton box. (See Fig. 55.)
Put slide pipe (A) and slide pipe (B) in the grooves of packing (D). Insert packing (A) between the slide pipe
(A) and slide pipe (B) at the rear. (See Fig. 56.)
Grooves
Packing (D)
(5) How to install packings (C) and (E)
Place packing (C) on packing (D) to
sandwich the slide pipe. Insert packing (E)
in the dust bag mounting portion at the
head section. Place the dust bag
(accessory) in front of packing (D).
(See Fig. 57.)
(6) How to install the top pad (A)
Put the top pad (A) over the whole unit so
that its projection is on the motor.
Close the lids of the carton box and bind
them together. (See Fig. 58.)
Carton box
Base packing
Fig. 55
Top pad (A)
Packing (A)
Slide pipe (B)
Packing (D)
Dust bag
(accessory)
Lid
--- 29 ---
Slide pipe (A)
Fig. 56
Packing (C)
Packing (E)
Fig. 57
Put the top pad (A) so that its
projection is on the motor.
Fig. 58
Carton
box

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents