Horizontal Termination - Empire Comfort Systems DVP42FP3 Installation Instructions And Owner's Manual

Direct vent gas fireplace heater
Table of Contents

Advertisement

NOTE: Termination cap should pass through the wall firestop
from the exterior of the building. Adjust the termination
cap to its final exterior position on the building.
Warning: Termination cap must be positioned so that arrow
is pointing up.
Attach the termination cap with the four wood screws provided.
Before attachment of the termination, run a bead of silicone sealant
rated above 250°F on its outside edge too, so as to make a seal to
the exterior wall.
NOTE: Wood screws can and should be replaced with appropriate
fasteners for use on stucco, brick, concrete or other types
of siding.
CAUTION: If exterior walls are finished with vinyl siding, (or
materials that could become discolored or warp) it is necessary to
install a vinyl siding standoff.
The vinyl siding standoff will be installed between the vent
termination and the exterior wall. See Figure 61. This horizontal vent
termination bolts onto the flat portion of the vinyl siding standoff, so
an air space will exist between the wall and the termination cap.
25664-0-0309

HORIZONTAL TERMINATION

Figure 68
Page 41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents