PEERLESS Stainless Steel Gas Boilers Installation, Operation & Maintenance Manual page 25

Stainless steel gas boilers
Hide thumbs Also See for Stainless Steel Gas Boilers:
Table of Contents

Advertisement

Figure 5.6: PI-80, PI-140, PI-199 Sidewall Venting
with 3" Pipe (V1000 Vent Kit).
Figure 5.7: PI-T50 & PI-T80 Sidewall Venting with
2" Pipe (V500 Vent Kit).
VENTING, INLET AIR AND CONDENSATE
Figure 5.8: PI-80, PI-140, PI-199 Sidewall Venting
with 3" Pipe (Concentric Vent Kit).
Figure 5.9: PI-T50 & PI-T80 Sidewall Venting with
2" Pipe (Concentric Vent Kit).
WARNING
All exhaust vent pipes must be glued, properly
supported, and pitched at a minimum of ¼" per foot
back to the boiler. Failure to do so may result in
severe personal injury, death, or substantial property
damage.
23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pinnacle

Table of Contents