Hot Gas Solenoid; Measured Fill Water Valve - GE Monogram ZDIS150WSS Technical Service Manual

Under-the-counter icemaker
Hide thumbs Also See for Monogram ZDIS150WSS:
Table of Contents

Advertisement

Measured Fill Water Valve

To remove the measured fi ll water valve:
1.
Turn the water supply off to the icemaker.
2.
Remove the 4 hex-head screws from the front
panel and remove the panel.
3.
Remove the 2 hex-head screws from the
measured fi ll water valve bracket.
Measured Fill Water Valve
Note: Place a pan or towel under the valve to catch
the water.
3.
Disconnect the water inlet and outlets tubing
from the quick-disconnect fi ttings on the
measured fi ll water valve.
4.
Disconnect the 2 electrical connectors from the
valve.
Outlet Tube
Inlet Tube
Disconnect

Hot Gas Solenoid

To remove the hot gas solenoid:
1.
Tip the cabinet back and securely prop it up to
access the hot gas valve solenoid.
2.
Disconnect the 2-wire connector from the
solenoid terminals.
3.
Remove the 7-mm hex-head screw from the
solenoid and lift the solenoid off the hot gas
valve.
– 26 –
Disconnect

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Monogram zdis150wwwMonogram zdis150wbb

Table of Contents