Carrier 59SP5A Installation, Start-Up, Operating And Service And Maintenance Instructions page 49

Series 100 single stage 4-way multipoise gas furnace
Table of Contents

Advertisement

HORIZONTAL RIGHT -
VERTICAL VENT CONFIGURATION
1
2
3
4
5
6
7
HORIZONTAL RIGHT -
RIGHT VENT CONFIGURATION
Attach vent pipe adapter with gasket to furnace casing.
Align notches in rubber coupling over standoffs on adapter. Slide clamps over the coupling.
Slide vent pipe through adapter and coupling into vent elbow.
Insert vent pipe into vent elbow.
Torque all clamps 15 lb.-in.
Attach combustion air pipe adapter with gasket to furnace.
Attach combustion air pipe to adapter with silicone. Pilot drill a 1/8-in.
hole in adapter and secure with a #7 x 1/2-in sheet metal screw.
Fig. 42 - - Horizontal Right (Appearance may vary)
HORIZONTAL RIGHT -
LEFT VENT CONFIGURATION*
*Requires Internal Vent Kit
See Product Data for Current Kit Number
49
A11341

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

59tn6a

Table of Contents