Carrier 59SP5A Installation, Start-Up, Operating And Service And Maintenance Instructions page 33

Series 100 single stage 4-way multipoise gas furnace
Table of Contents

Advertisement

HUM
SEC-2
SEC-1
LED
OPERATION &
DIAGNOSTIC
LIGHT
COM
HEAT
COOL
FAN
SPARE2
SPARE1
EAC-2
115−VAC (L2)
NEUTRAL
CONNECTIONS
BLOWER OFF-DELAY
24−V THERMOSTAT
TERMINALS
TWINNING AND/OR
COMPONENT TEST
TERMINAL
HUMIDIFIER TERMINAL
(24−VAC 0.5 AMP MAX)
3−AMP FUSE
TRANSFORMER 24VAC
CONNECTIONS
PL1 − LOW VOLTAGE MAIN
HARNESS CONNECTOR
BLOWER SPEED
SELECTION TERMINALS
EAC TERMINAL
(115 VAC 1.0 AMP MAX.)
EAC-1
115 VAC (L1)
INPUT
L1
Fig. 35 - - Single Stage Furnace Control
33
PL-2 HOT SURFACE
IGNITOR (HSI) &
INDUCER MOTOR
(IND) CONNECTOR
BL−1
PR-1
IND
HSI
A11391

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

59tn6a

Table of Contents