Carrier 59SP5A Installation, Start-Up, Operating And Service And Maintenance Instructions page 16

Series 100 single stage 4-way multipoise gas furnace
Table of Contents

Advertisement

5
If alternate vent position
is required, loosen clamp
on vent elbow inlet.
Remove relief tube
from port on collector
box.
Unconverted Factory Trap Configuration
As Viewed in the Horizontal Left Orientation
Rotate elbow to
9
desired position
and torque clamp
on inlet 15 lb.-in.
Slide relief tube in
stand-offs to adjust
length.
Attach condensate
trap with screw to
collector box.
Align trap over middle
and right-hand port on
collector box.
Horizontal Left Trap Configuration
Fig. 11 - - Horizontal Left Configuration
16
Remove trap from collector
box.
Remove relief tube from
relief port on condensate
trap.
Remove front pressure
switch tube and discard.
Remove middle and right
6
plug from collector box.
Install plug in open
ports on collector box.
Connect relief tube to port
on collector box.
Connect tube from Loose
7
Parts bag to port on front
pressure switch.
Route pressure switch tube
8
underneath relief tube and
connect to port on
collector box.
Connect relief tube to relief
port on condensate trap.
A11282

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

59tn6a

Table of Contents