Inductive Throttle Sensor (Its) Testing And Replacement; Its And Plunger - E-Z-GO TXT 48V Repair And Service Manual

Electric powered golf car
Hide thumbs Also See for TXT 48V:
Table of Contents

Advertisement

ELECTRONIC SPEED CONTROL - TCT
Read all of Section B and this section before attempting any procedure. Pay particular attention to all Notices, Cautions, Dangers and Warnings.
INDUCTIVE THROTTLE SENSOR (ITS)
TESTING AND REPLACEMENT
Tool List
Phillips screwdriver ...................................................... 1
Wrench, 7/16" .............................................................. 1
Nut driver, 7/16" ........................................................... 1
Drill bit, 7/32" ............................................................... 1
DVOM.......................................................................... 1
Raise the rear wheels of the vehicle and support the
vehicle on jack stands (Refer to Lifting Procedure in
Section 'B'). Test the vehicle stability before proceeding.
Remove the driver side rocker panel insert and pull the
floormat forward to expose the metal cover to the pedal
box. Remove the cover and remove the two screws
securing the plastic cover to the pedal box, remove the
cover (Ref. Fig. 10 on Page E-10).
Micro Switch
Adjusting Cam
Fig. 10 ITS and Plunger
With the DVOM set to volts, probe the black wire at the
ITS with the positive probe and attach the negative
probe to the B- at battery. Place the direction selector in
'F' and turn the key switch to 'ON'. Depress the acceler-
ator pedal. The meter should read 1.0V ± 0.3V when the
solenoid clicks and 2.7V ± 0.5 volts at full pedal. If the
reading is out of specification, the ITS sensor must be
replaced.
The 'ITS' attaches to the plastic pedal box using two plas-
tic studs and two speed nuts. Use care not to overlighten
the nuts which could strip the plastic studs while tighten-
ing the nuts enough to prevent movement of the 'ITS.
Page E-10
Qty. Required
Lock Nut
Micro Switch
Plunger
'ITS'
Connector
Repair and Service Manual
Carefully remove the two wires that attach to the ITS
and carefully remove the nuts securing the ITS to the
plastic pedal box studs.
Install a new ITS being careful to align the ITS and not to
overtighten the retaining nuts. Attach the wiring.
With the accelerator pedal in the full up position, insert a
7/32" drill bit between the plunger and the face of the
ITS. The drill bit should be used to verify and adjust the
distance between the face of the ITS and the face of the
plunger (Ref. Fig. 11 on Page E-11). If the plunger
needs adjustment, loosen the lock nut at the accelera-
tor yoke and rotate the plunger until the desired dimen-
sion is achieved. Firmly tighten the jam nut.
Replace the plastic cover and press it firmly into place
before tightening the cover screws.
Replace the metal cover, floormat and rocker panel
insert.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents