Carrier 59MN7A Installation, Start-Up, Operating And Service And Maintenance Instructions page 14

Modulating 4-way multipoise condensing gas furnace series 200
Table of Contents

Advertisement

If alternate vent position
is required, loosen clamp
on vent elbow inlet.
Remove relief tube
from port on collector
box.
Unconverted Factory Trap Configuration
As Viewed in the Horizontal Left Orientation
Rotate elbow to
desired position and
torque clamp on inlet
15 lb.-in.
Slide relief tube in
stand-offs to adjust
length.
Attach condensate
trap to collector box
with screw.
Align trap over middle
and right-hand port on
collector box.
Horizontal Left Trap Configuration
Fig. 10 - - Horizontal Left Configuration
(Appearance May Vary)
14
Remove trap from
collector box.
Remove relief tube
from relief port on
condensate trap.
Remove pressure switch tube
from port on collector box.
Remove middle and right
plug from collector box.
DO NOT DISCARD
Install plugs in open
ports on collector box.
Connect relief tube to
port on collector box.
Trim excess tube.
Route pressure switch tube
underneath relief tube and
connect to port on collector box.
Connect relief tube to
relief port on condensate
trap.
A11586

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

59tp6a series 2

Table of Contents