MHSC STLDVNS Installation And Operating Instructions Manual page 21

Designer series direct vent gas fireplace
Table of Contents

Advertisement

VeNTING INSTaLLaTIoN
Apply Mastic to all
Four Sides
Figure 22 -
Install Horizontal Termination
FP1955
horizontal vent cap
Apply Mastic
to all Four
Sides
FP1956
Figure 23 -
Install Simpson/Selkirk Vinyl Siding Standoff and
Termination
6. Slide the stop over the vent pipe before connecting the
FP1956
horizontal run to the vent cap. Figure 24
vinyl siding
7. Carefully move the fireplace with vent assembly
attached toward the wall and insert the vent pipe into
the horizontal termination. The pipe overlap should
be a minimum of 1
connection. Fasten all vent connections with screws
provided.
8. Slide the wall thimble against the interior wall surface
and attach with screws. Figure 24
20302381
T
H O
Wood Screw
Cut Vinyl Siding Away
to Fit Standoff
Standoff #1250 or
5DT-VS
(Not required for
MHSC termination)
H O
Nut
Wood Screw
1
/
". Apply silicone to the outer pipe
4
Vent Cap
(Horizontal
Termination)
Vent Cap
Figure 24 -
Install Firestop on Horizontal Vent Pipe
Do not recess vent termination into any
wall. This will cause a fire hazard.
Termination
all rear vent through-the-wall applications
must use MhSC-designed 5 x 8 square ter-
mination. No other manufacturer's termina-
tion is permitted in this application.
T
Bolt
For more information, follow instructions
provided with terminations.
Designer Series Direct Vent Gas Fireplace
Inerior Wall
Surface
FP1957
Screw
FP1957
vent cap w hor pipe
Firestop
Horizontal
Vent Pipe
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

StldvpsCrldvpsClldvnsCrldvnsPfldvnsPfldvps ... Show all

Table of Contents