MHSC STLDVNS Installation And Operating Instructions Manual page 15

Designer series direct vent gas fireplace
Table of Contents

Advertisement

VeNTING INSTaLLaTIoN
Flue Pipe
Cover
Flue Pipe
Adapter
Figure 12 -
Remove 16 screws from Flue Pipe Adapter and
Flue Pipe Cover
4. Remove six (6) screws securing the flue pipe to the
back of the intake box and remove the pipe and gasket.
Figure 13
5. Replace the flue pipe to top of firebox. Ensure the gasket
is in place and undamaged. Secure with six (6) screws.
FP1991
Figure 14
remove screws
6. Place the flue pipe cover and gasket removed in Step
3 over the flue opening in bottom of the intake box.
7. Refit the flue pipe adapter and gasket to the top of fire-
place. Secure the adapter with six (6) screws removed
in Step 1.
20302381
Screws
FP2833
Figure 13 -
Remove Flue Pipe
Screws
Figure 14 -
Attach Flue Pipe to Top Vent Configuration
Designer Series Direct Vent Gas Fireplace
after conversion to top vent configuration,
the 5" (127 mm) flue pipe should be
concentric with the 8" (203 mm) outer collar
within 1/4".
Flue Cover
Flue Pipe
FP1992
remove flue pipe
FP1993
replace flue pipe
Screws
FP2834
Flue Pipe
FP2835
15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

StldvpsCrldvpsClldvnsCrldvnsPfldvnsPfldvps ... Show all

Table of Contents