Installation - Empire Comfort Systems BVD34FP30(F,L)N-2 Installation Instructions And Owner's Manual

B" vent zero clearance gas fireplace
Table of Contents

Advertisement

Framing and Finishing
1. Choose unit location.
of the frame. See Figures 9 & 11.
Preset depth to suit facing material (adjustable to 1/2", 5/8" or
3/4" depths).
4. Use (8) 1/2" hex-head screws supplied in hardware package to
Note: Maintain one inch (1") of clearance around vertical vent pipe.
and clearances. Failure to follow the B-Vent manufacturer's
Page 10

INSTALLATION

Figure 9
Figure 10
A fresh air kit is available as an optional feature with this appliance.
The fresh air kit helps to decrease the amount of room air taken by
utilizing outside air for combustion. It is strongly recommended that
it be installed. Installation of the fresh air kit should be performed
To install the BVA1 fresh air kit, refer to the installation instructions
provided with the kit.
Note: The outside air kit can terminate at any level with the
exception that it must terminate at least 1 ft below the vent
termination cap. The fresh air kit inlet hood should be positioned
at least 2 ft above the ground level, in a manner that will not
allow snow, leaves, etc. to block the inlet.
WARNING: Exhaust products of gasoline engines are
the air.
Framing (Figure 11)
place. Framing should be positioned to accommodate wall covering
constructed of 2 x 4 lumber or heavier. The framing headers may
framing dimensions.
CAUTION: MEASURE FIREPLACE DIMENSIONS AND
DETAILS BEFORE FRAMING CONSTRUCTION
BEGINS.
Framing dimension "A" includes a three inch clearance for
26534-1-0610

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents