Receiving and Handling

The unit ventilator is packaged in clear stretch wrap and
protective cardboard.
Note: Before unwrapping, make a visual inspection of the
unit for any damage that may have occurred during
shipping. All orders are shipped FOB (Freight on
Board) from the factory, therefore any claims must
be made with the delivering carrier.
Figure 9.
Horizontal unit ventilator as shipped
Following visual inspection, carefully begin the following
procedures:
1. Carefully remove the stretch wrap and the top
cardboard cover.
2. Remove remaining cardboard blocking.
3. Remove the bottom access panel with a 7/32-in. Allen
wrench.
4. Verify nameplate sales order number is correct.
5. Remove shipping bracket from the lower rear corners
of the unit and shipping skid. Access to the screws
holding unit to the skid is obtained inside the unit.
Figure 10. Shipping skid removal
6. Rotate fan wheels manually. Wheels should move
freely and be in proper alignment. Visually inspect the
fan area for obstructions or shipping damage.
7. Remove all applicable knock-outs for coil piping and
electrical connections (see
Figure 7, p.
17).
UV-SVN02C-EN
Figure 5, p. 13
through
19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Huvc

Table of Contents