Figure 2.2: Two-post Flush-mount Configuration
2
Attach one rail to the front post flange with two user-supplied screws (item
2).
3
Slide the plunger bracket forward against the vertical post and secure the
plunger bracket to the post flange with two user-supplied screws (item 3).
4
Repeat this procedure for the second rail.
xxx
|
xxx
Installation
17
Need help?
Do you have a question about the Server Console Switch and is the answer not in the manual?
Questions and answers