Removing Drain Plug And Leveling The Ice Storage Bin; Air-Cooled Baffle - Manitowoc S Service Manual

S model
Table of Contents

Advertisement

Installation Instructions
Removing Drain Plug and Leveling the Ice
Storage Bin
1. Remove threaded plug from drain fitting.
2. Screw the leveling legs onto the bottom of the bin.
3. Screw the foot of each leg in as far as possible.
The legs must be screwed in tightly to prevent them
from bending.
4. Move the bin into its final position.
5. Level the bin to assure that the bin door closes and
seals properly. Use a level on top of the bin. Turn the
base of each foot as necessary to level the bin.
6. Inspect bin gasket prior to ice machine installation.
(Manitowoc bins come with a closed cell foam
gasket installed along the top surface of the bin.)
7. Remove all panels from ice machine before lifting.
Remove both front panels, top cover, left and right
side panels.
8. Install ice machine on bin.
Leveling Leg and Foot
2-8
! Caution
THREAD LEVELING
LEG INTO BASE OF
CABINET

Air-Cooled Baffle

SELF-CONTAINED AIR-COOLED ONLY
The air-cooled baffle prevents condenser air from
recirculating. To install:
1. Remove the back panel screws next to the
condenser.
2. Align the mounting holes in the air baffle with the
screw holes and reinstall the screws.
SV1606
Section 2
SCREWS
Air Baffle
Part Number 80-1480-3
AIR
BAFFLE
SV1607

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents