3-in-1 Sensor Installation Guidelines
INSTALLATION HEIGHT
ground (higher is better for wind measurement) in an open area. Secure to
fence post, 2'x4' wood, 3/4" pole, etc. (not included)
LEVEL INSTALLATION
installation for accurate wind measurement.
Top or Side Mount
1. Insert the mounting base into
the hole on the bottom of the
sensor.
2. Use one of the screws included
in the hardware bag to fasten
the lower sensor housing to the
mounting base.
3. Make sure the sensor is level
using a bubble level.
4. Fasten mounting base to a post
or railing using 2 screws.
Pole Mount
1. Insert pole (we recommend 3/4"
schedule 40 PVC / 25.8 mm O.D.,
not included) or similar item all the
way into the hole on the bottom of the
sensor. Note: Mounting base is not
used.
2. Use one of the screws included in the
hardware bag to fasten the lower
sensor housing securely to the pole.
3. Make sure the sensor is level using a
bubble level.
The 3-in-1 sensor is now ready to use.
Basic Setup is Complete
The 3-in-1 sensor will now synchronize with the display unit. It may take a few
minutes for synchronization to complete. If both or one of the units appear to
be functioning improperly, please refer to the troubleshooting section.
Mount the sensor at least 5 feet (1.5 meters) off the
Use a bubble level (not included) to ensure level
Top Mount
10
Side Mount
Pole Mount
Do not install during
electrical storms.
Do not place pole
or sensor near
electrical lines or
electrical equipment.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents