21. COMMISSIONING REPORT
THIS APPLIANCE HAS BEEN FACTORY TESTED PRIOR TO SHIPMENT.
HOWEVER, IT IS NOT A "PLUG-IN" APPLIANCE AND REQUIRES FIELD ADJUSTMENT
AND COMMISSIONING TO ENSURE SAFE AND EFFICIENT OPERATION.
A QUALIFIED GAS SERVICE TECHNICIAN MUST COMMISSION THE APPLIANCE AND
COMPLETE THE COMMISSIONING REPORT.
CONFIRM THAT THE APPLIANCE IS INSTALLED ACCORDING TO ALL LOCAL AND NA-
TIONAL CODES AND THE INSTRUCTIONS IN THIS MANUAL.
ENSURE THAT SITE CONDITIONS MEET THE SPECIFICATIONS IN THIS MANUAL RE-
GARDING:
SUSPENSION
CLEARANCES TO COMBUSTIBLE MATERIAL
VENTING AND AIR SUPPLY
ELECTRICAL SUPPLY, WIRING, AND CONNECTION
GAS CONNECTION, SUPPLY AND MANIFOLD PRESSURE
THIS COMMISSIONING REPORT MUST BE SUBMITTED TO OUR TECHNICAL SER-
VICES DEPARTMENT PRIOR TO ANY CALL FOR TECHNICAL ASSISTANCE.
FAX THE COMPLETED REPORT TO 1-866-361-0523
INSTALLING CONTRACTOR: ......................................................................
COMMISSIONING TECHNICIAN: .................................................................
ADDRESS: ......................................................................
STATE/PROV: ......................................................................
DATE INSTALLED: .................................
PROJECT NAME: ......................................................................
PROJECT CITY: ......................................................................
HEATER MODEL #: ......................................................................
HEATER SERIAL #: ......................................................................
ECO-X / IL-X Manual
IM100117
RD: NOV 2009
RL: 05B - BA
Call Technical Services: 1-877-446-3727
CITY: ......................................................................
PHONE: ......................................................................
CELL: ......................................................................
28