Delta Energy Systems SOLIVIA Gateway M1 G2 Operation And Installation Manual page 12

Delta solivia gateway m1 g2 - operation and installation manual
Hide thumbs Also See for SOLIVIA Gateway M1 G2:
Table of Contents

Advertisement

The ripple control receiver that controls the power management (power limitation) has
to be connected to the inputs 1 to 4. The receiver that controls the power factor (cos
phi) has to be connected to the inputs 5 to 8.
After connection of the ripple control receiver(s) the gateway has to be configured in
order to do the required control of the SOLIVIA solar inverters. For further information,
please refer to Chapters 10.5 and 10.6.
Of course it is also possible to connect only one ripple control receiver, i. e. the one that
controls the power management.
Figure 3: Ripple control receivers circuit diagram
NOTICE
The cables connecting the SOLIVIA gateway with the ripple control receiver(s) should
meet the following specifications:
Max. conductor cross-section: 0.5 mm
Min. conductor cross-section: 0.14 mm
Tightening torque: 0.12 – 0.15 Nm
Max. cable length: 2 m
10
(AWG20)
2
(AWG26)
2
Operation and installation manual SOLIVIA Gateway M1 G2

Advertisement

Table of Contents
loading

Table of Contents