Installation Procedure; Registration; Mounting; Mounting On A Din Rail - Delta Energy Systems SOLIVIA Gateway M1 G2 Operation And Installation Manual

Delta solivia gateway m1 g2 - operation and installation manual
Hide thumbs Also See for SOLIVIA Gateway M1 G2:
Table of Contents

Advertisement

7

Installation Procedure

7.1

registration

First register for a SOLIVIA Monitor user account on the web at: http://register.solivia-
monitor.com. After registering you will receive, via email, a user name, a password,
and a link to a Configuration Wizard that will allow you to set up and monitor your site
from the SOLIVIA Monitor web portal. Complete the Configuration Wizard setup before
installing the monitoring hardware. In this way, you can go to the web portal after the
hardware installation and verify everything is working correctly.
NOTICE
At the install site, verify the internet connection is active by connecting a laptop to the
internet connected network point and pointing a web browser to www.solar-inverter.
com.
7.2

Mounting

Mount the SOLIVIA gateway with the appropriate AC power location specified in Chap-
ter 5.2. You have either the possibility to mount the SOLIVIA gateway on a DIN rail or
directly to the wall.
7.2.1

Mounting on a dIN rail

The gateway can be mounted on the following DIN Rails:
DIN Rail according to EN60715 TH35-15
DIN Rail according to EN60715 TH35-7.5
The gateway should be installed horizontally with connectors on the bottom.
To mount, snap the gateway on the DIN rail as shown in Figure 1:
1.
Pull the gateway's DIN rail latch OUT.
2.
Tilt the unit slightly upwards, hook the top end onto the DIN rail and push down-
wards until stopped.
3.
Position the bottom front end against the DIN rail until it has snapped onto the DIN
rail.
4.
Push the gateway's DIN rail latch IN to lock.
1
Figure 1: Mounting the gateway on a DIN rail
8
2
2
Operation and installation manual SOLIVIA Gateway M1 G2