Jacuzzi ProTech Owner's Manual page 15

Led series
Hide thumbs Also See for ProTech:
Table of Contents

Advertisement

7.
Select the power supply inlet you want to use (Figure A). Feed power
cable to control box, then install it through the large opening provided in
the bottom side of the box.
8. Connect wires, color to color, on terminal blocks TB1 and TB3 (Figures
C-F, Page 12). TIGHTEN SECURELY! All wires must be hooked up secure-
ly or damage could result.
9. Install control box door and screws and reinstall the cabinet side panels.
Note: Pump Locations Vary by Model
6
2
1. Control Box
2. Power Supply Entrance(s)
3. 2-Speed Pump #1
4. Heater
5. Spa Drain Valve
6. Pump Drain Plug(s)
1. Terminal Block
2. Bonding Lug
3. Grounding Terminal
Equipment Area
4
7
7. 1-Speed Pump #2
8. Circulation Pump
9. Optional CD Ozonator (Purchased Separately)
10. Optional Mazzei Injector (Required for CD Ozonator
Use - Purchased Separately)
Figure-B - Control Box
2
TB1
Figure-A
9
1
5
8
1
3
10
Flow
3
6
Circulation Pump
Behind Load Box
2
Page 11

Advertisement

Table of Contents
loading

Table of Contents