Chapter 3
Switch Installation (8-Port Switches)
Step 4
Attach the screw template to the wall.
Use a 0.144-inch (3.7 mm) or a #27 drill bit to drill a 1/2-inch (12.7 mm) hole in the three screw
Step 5
template slots.
Insert three screws in the slots on the screw template, and tighten until they touch the top of the
Step 6
screw template.
Step 7
Remove the screw template from the wall.
Step 8
Place the switch onto the mounting screws, and slide it down until it locks in place, as shown
in
Figure
Figure 3-6
1
Switch
2
Screw
After the switch is mounted on the wall, do these tasks to complete the installation:
Power on the switch. See the
1.
Connect to a 10/100 or 10/100/1000 port, and run Express Setup. See the switch getting started guide
2.
for instructions.
OL-7075-05
3-6.
Installing the Switch On a Wall
1
3
Slides on this way
"Verifying Switch Operation" section on page
3
2
2
Catalyst 2960 Switch Hardware Installation Guide
Installing the Switch
2
3-6.
3-13