Download Print this page

If You Smell Gas - Cecilware ME-10G Operation Manual

Automatic gas water boiler

Advertisement

FOR YOUR SAFETY, THE FOLLOW SAFETY PRECAUTIONS SHOULD

IF YOU SMELL GAS:

• OPEN WINDOWS
• DON'T TOUCH ELECTRICAL SWITCHES
• EXTINGUISH OPEN FLAMES
• IMMEDIATELY CALL YOUR GAS SUPPLIER
1. Instructions must be posted in a prominent location and all safety precautions taken
in the event the user smells gas. Obtain this information from your local gas supplier.
2. LIGHTING: Follow the instruction on page 6 and label attached to right side of water
boiler.
3. Do not place anything over the flue opening.
4. Do not place combustibles or non-combustible materials in the
proximity of water boiler as this could cause fires or obstruct air flow to the main
burners.
5. This installation must conform with local codes, or in absence of local codes with the
National Fuel Gas Code ANSI Z223.1, latest edition.
6. Provide adequate air supply and ventilation.
7. Provide adequate clearance for air openings into the combustion chamber.
8. Provide clearance for servicing and proper operation. Minimum clearance from
combustible construction 8" from back and 6" from side.
9. Boiler must be disconnected from gas supply during any pressure testing of
pipelines in excess of 1/2 psig, and isolated (by turning off gas shut-off valve) during
any testing less than 1/2 psig.
10. Retain this manual for future reference.
UNPACKING INSTRUCTION: Carefully unpack the water boiler and inspect
immediately for shipping damages. Your automatic water boiler was shipped in a carton
designed to give maximum protection in normal handling. It was thoroughly inspected
before leaving the factory and the carrier accepted and signed for it. File any claims for
shipping damage or irregularities with the carrier.
ASSEMBLY: The four legs, faucet, float ball, and vent cap drain are packed separately
with the water boiler. Install legs by tilting the water boiler on its side and screwing the
legs into the leg supports until hand tight. Carefully right the unit and install it in its
permanent location, being sure to leave at least 6" on the right side of the water boiler
for access to the control box. Level the unit by adjusting the bottom pad of the legs.
Screw the ball float (54 on Parts III.) onto the end of the water
SAFETY PRECAUTIONS
BE FOLLOWED AND ENFORCED.
2

Advertisement

loading

This manual is also suitable for:

Me-15g