Toshiba Satellite A100 Maintenance Manual page 217

Toshiba personal computer
Hide thumbs Also See for Satellite A100:
Table of Contents

Advertisement

4 Replacement Procedures
Install the Switch Board
Install the switch board according to the following procedures and Figure 4-40.
1. Seat the switch board in the correct position.
2. Seat the switch cover in the correct position and secure the following 7 latches, in that
order:
- Two right latches
- One latch on the front and bottom sides
- Three left latches
3. Turn the top cover upside down.
4. Secure the switch board with two M2.5x4 black flat-head screws.
5. Connect the switch board flat cables to CN4000 on the switch board.
6. Secure the EMI tape and Mylar in the correct position.
4-64
4.18 Switch Cover and Switch Board
Satellite A100/A105 / TECRA A7
Maintenance Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Satellite a105Satellite tecra a7Tecra a7

Table of Contents