Wall Mounting; Boiler And Combiplus Installation - Viessmann Vitodens 100-W WB1B Series Installation And Service Instructions Manual

Vitodens 100-w wb1b series wall-mounted, gas-fired condensing boiler with optional on demand hot water combiplus kit
Table of Contents

Advertisement

Vitodens 100-W, WB1B Installation & Service

Wall Mounting

Boiler and CombiPLUS installation

The Vitodens 100-W boiler and CombiPLUScan be
wall-mounted on:
- a brick/concrete wall
- wood studs
- metal studs
CAUTION
Whichever mounting method is used, ensure that the
boiler bracket and CombiPLUS is tightly and securely
fastened to wall. Failure to secure boiler or CombiPLUS
properly could cause loosening, posing a severe safety
hazard.
2.
Legend
A Mounting template
B CombiPLUS mounting template
1.
mm
Following are the installation instructions for the mounting
bracket on each material. Skip to the installation
instructions applicable to your installation requirements.
Installation of mounting bracket on brick/concrete wall:
1. Drill holes [Ø e"(10 mm)], using mounting templates
supplied with the boiler and the CombiPLUS.
2. Align wall mounting boiler bracket and attach to wall
with the screws and plastic anchors supplied. The
CombiPLUS is mounted directly to the wall with the
screws and plastic anchors supplied.
1.
2.
Dimensions
1.
mm
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents