Reconnect Rectifier-Regulator; Installing B+ Lead Into Plug; Connecting Ground Lead; Grounding Bracket And Attached Connector - Kohler CH18-745 Service Manual

Horizontal crankshaft
Hide thumbs Also See for CH18-745:
Table of Contents

Advertisement

Kohler Engine Parts Call K&T 606-678-9623 or 606-561-4983
1
4
Figure 11-67. Breather Cover Fastener Torque
Sequence.

Reconnect Rectifier-Regulator

1. Install the rectifier-regulator in the blower housing,
if removed previously, then connect the rectifier-
regulator ground lead with the washer and silver
screw through the eyelet as shown in Figure
11-68. If a grounding bracket is used, secure with
the lower mounting screw and washer, against the
outer side of the rectifier-regulator. See Figure
11-70.
Figure 11-68. Connecting Ground Lead.
2. Install the B+ terminal/lead into the center position
of the rectifier-regulator plug and connect the plug
to the rectifier-regulator. See Figures 11-69 and
11-70.
3
2
Figure 11-69. Installing B+ Lead into Plug.
Figure 11-70. Grounding Bracket and Attached
Connector.
SMART-SPARK
1. On engines with SMART-SPARK
www.mymowerparts.com
Grounding
Module
SAM module to the blower housing or cylinder
baffle. Do not over-tighten the retaining screws.
See Figure 11-71.
Section 11
Reassembly
Bracket
, reinstall the
11
11.19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents