Chapter 3
Maintaining the Server
Replace all drives and drives trays to the drive bays.
Step 13
Replace the front chassis panel.
Step 14
Replace the top cover.
Step 15
Replace the server in the rack, replace cables, and then power on the server by pressing the Power
Step 16
button.
Figure 3-8
1
1 Backplane assembly securing screws (two)
OL-26647-01z
Replacing the Drive Backplane
2
SYS FAN1
SYS FAN2
Port 1
SYS FAN3
SYS FAN4
Port 0
2
Installing or Replacing Server Components
PCIe riser 1
CPU 1
PCIe riser 2
CPU 2
PSU 1 (bottom)
PSU 2 (top)
2 SAS expander securing screws (three)
Cisco UCS C24 Server Installation and Service Guide
3-15