Preparing For Server Installation - Cisco UCS C24 Installation And Service Manual

Server
Table of Contents

Advertisement

Preparing for Server Installation

Rack Requirements
This section provides the requirements for the standard open racks.
The rack must be of the following type:
Equipment Requirements
The slide rails supplied by Cisco Systems for this server do not require tools for installation. The inner
rails (mounting brackets) are pre-attached to the sides of the server.
Slide Rail Adjustment Range
The slide rails for this server have an adjustment range of 24 to 36 inches (610 to 914 mm).
Cisco UCS C24 Server Installation and Service Guide
2-4
A standard 19-in. (48.3-cm) wide, four-post EIA rack, with mounting posts that conform to English
universal hole spacing, per section 1 of ANSI/EIA-310-D-1992.
The rack post holes can be square 0.38-inch (9.6 mm), round 0.28-inch (7.1 mm), #12-24 UNC, or
#10-32 UNC when you use the supplied slide rails.
The minimum vertical rack space per server must be one RU, equal to 1.75 in. (44.45 mm).
Chapter 2
Installing the Server
OL-26647-01

Advertisement

Table of Contents
loading

Table of Contents