Accessories Installation - Sea Breeze PAHS127 User Manual

Mobile air conditioner pas12 12,000 btu cooling only pahs127 12,000 btu cooling, 7,000 btu heating
Table of Contents

Advertisement

1. Caster Installation:
Note: The casters must be assembled before using the unit. Tilt the unit minimally to install the
casters.
1. Open the accessory box and remove the casters (4).
2. Lift up the unit horizontally 4 to 8" above the ground.
3. Fit the caster into the opening in the base. (See diagrams).
tilt angle
2. Assemble drain pipe
The unit must have the drain pipe assembled properly before using. If not, the water will drain
outside the tank causing a potential hazard.
1) Remove the drain pipe, plug, and clamp from the packing box.
2) Remove the plug and attach the pipe securely to the water outlet on the base.
3) Attach the pipe to the clamp on the back board of the unit.
Clamp

ACCESSORIES INSTALLATION

20
Casters
backside
Attach the pipe
To the clamp

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pas12

Table of Contents