Installation - Electric And Gas Units - Henny Penny CLIMAPLUS LCS Applications Manual

Applications manual and cooking guide
Table of Contents

Advertisement

Fig. 1
Fig. 2
59
Installation
Refer to the following pages for important information regarding the
installation of LCS and LCG ClimaPlus Combis. It is recommended
that installation be accomplished by a certified and properly trained
technician.
NOTE: When installing a ClimaPlus combi, humidity calibration must
be performed. This process takes approximately 45-60 minutes. (page 62)
Site, leveling
1) Check for any transport damages. Should there be any signs of transport
damage immediately inform your dealer/freight forwarder.
2) Check installation site. Check entrance clearance.
Minimum entrance space needed without pallet:
Model 6 & 10:
Model 1020:
Model 20:
Model 40:
Floor at installation site must be level.
Cold water line in place. (page 63)
2 in. (50 mm) drain connection installed.
Max. drain height for floor units: 4 in. (100mm)
Electrical power supply/protective measures installed and sized correctly.
(page 60-61)
3) Remove all cartons, packing materials, documents etc. from the interior cabinet.
4) Remove grid shelves/trolley from cabinet.
5) Take unit off the pallet.
Moving unit without pallet: Sizes 6, 10, 1020 (Fig. 1)
Moving unit without pallet: Sizes 20, 40 (Fig. 2)
Minimum clearance sides and back:
2 in. (50 mm)
Service clearance, left side:
20 in. (500 mm)
Clearance for door opening:
Model 6 & 10:
20
Model 1020:
29
Model 20:
28
Model 40:
30
35
1
in. (902 mm)
2
49
in. (1262 mm)
5
8
39
7
in. (1012 mm)
8
52
1
in. (1332 mm)
2
1
in. (521 mm)
2
1
in. (749 mm)
2
3
in. (730 mm)
4
3
in. (781 mm)
4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents