Follett HCC1400A Operation And Service Manual page 22

Hcc/hmc1400a, hcc/hmc1400w ice machines
Table of Contents

Advertisement

17. Insert a bolt into the auger shaft and fi nger tighten.
18. Using a wrench, rotate the shaft clockwise to align
the keyways in the gear housing and the shaft so as
to accept the key.
19. Insert the key into the keyway.
20. Remove bolt and reinstall the washer and bolt.
Place retainer over bolt and secure with nut and
washer.
21. Lubricate body of stream divider with petrol-gel and
reinstall.
22. Plug gearmotor power cord into electrical box.
Fig. 24
Fig. 25
Fig. 26
22
22
Apply
petrol-gel

Advertisement

Table of Contents
loading

This manual is also suitable for:

Di-fr36Di-fr36-flDi-fr36-dwHmc1400aHmc1400wHcc1400w ... Show all

Table of Contents