Floor Protection; Minimum Opening For Masonry & Zero Clearance Fireplace; Mantel Projections - Quadra-Fire MT VERNON Pellet Insert Advanced Energy (AE) MTVERNINSAE-CSB Owner's Manual

Installation and operation mt vernon pellet insert advanced energy (ae)
Table of Contents

Advertisement

Mt. Vernon Pellet Insert (AE)
Built-In Vertical
se two
clear heat shield and hopper
Figure 10.1
C. Masonry and Zero Clearance Fireplaces
A
E
Figure 10.2
Location
A
Insert side to combustible side wall
B
Insert top to max. 2-1/4 inch face trim
C
Insert side to max. 2-1/4 inch face trim
D. Floor Protection
Location
D
Floor protection hearth extension from
door opening
E
Floor protection to the side of door
opening
Page 10
in
mm
in
mm
in
mm
degree elbows to
Face
Mantel
Trim
B
C
D
Inches Millimeters
6
152
0
0
Inches
Millimeters
6
152
6
152
E. Minimum Opening for Masonry and Zero
Clearance Fireplaces
Figure 10.3
Location
F
Rear Width
G
Depth
H
Height
I
Front Width
F. Mantel Projections
0
0
Figure 10.4
The maximum mantel depth (J) is 12 inches (305mm) with
a minimum vertical height (K) of 12 inches (305mm).
However if your mantel has a depth of 10 inches (254mm)
then the vertical minimum height is 10 inches (254mm).
7036-135E
H
G
F
I
Inches
24
15
23-7/8
34
J
K
September 1, 2008
R
Millimeters
610
381
606
864

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents