Fire Risk. Explosion Risk.
Do NOT pack insulation or other combustibles between ceiling fi restops.
• ALWAYS maintain specifi ed clearances around venting and fi restop systems.
• Install wall shield and ceiling fi restops as specifi ed.
Failure to keep insulation or other material away from vent pipe may cause fi re.
Top Vent - Horizontal Termination
Venting with 1 elbow
H
Maximum
1
V Minimum
SLR
90 Elbow
1-1/2 ft.
1 ft.
305 mm
3 ft.
2 ft.
610 mm
5 ft.
3 ft.
914 mm
7 ft.
4 ft.
1.2 m
14 ft.
H MAX. =14 ft. (4.3 m)
V + H MAX. = 40 ft. (12.2 m)
Figure 7.4
24
610 mm
914 mm
1.5 m
2.1 m
4.3 m
H
1
Heat & Glo • SLR • 2143-900 Rev. D • 12/08
WARNING
Note: Use SLP Series
components only.
Note: There MUST be a 25%
reduction in total H when using
fl ex vent except when using the
simple up and out installation
(see Figure 7.3).
Note: The SLP-HRC-SS and
SLP-HRC-ZC-SS
caps are not approved for use
with propane (LP) fuel.