Electrical Requirements; Electrical Hook-Up - Bunn DUAL SH DBC Installation & Operating Manual

.5 & 1.0 gallon
Hide thumbs Also See for DUAL SH DBC:
Table of Contents

Advertisement

ELECTRICAL REQUIREMENTS

WARNING - The brewer must be disconnected from the power source until specified in Initial Set-Up.
Refer to Data Plate on the Brewer, and local/national electrical codes to determine circuit requirements.

ELECTRICAL HOOK-UP

CAUTION – Improper electrical installation will damage electronic components. Damage caused by incorrect
electrical connections is not covered by warranty.
1. An electrician must provide electrical service as specified in conformance with all local, state and federal
electrical codes.
2. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
3. Remove the front panel beneath the sprayheads to gain access to the terminal block.
4. Feed the cord through the strain relief and connect it to the terminal block.
5. Connect the brewer to the power source and verify the voltage at the terminal block before proceeding. Re-
place the front panel.
6. If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumbing
has been hooked up, the brewer is ready for Initial Set-Up.
WARNING – Electrical connections must be made as specified above. Failure to follow these instructions can
result in personal injury, property or equipment damage.
L2 RED
WHITE
NEUTRAL
L1 BLACK
GREEN
120/208 and 120/240 volt ac models
Note: This electrical service consists of 3 cur-
rent carrying conductors (Neutral, L1 and L2)
and a separate conductor for earth ground.
Page 4
L2 RED
L2
WHITE
N
NEUTRAL
L1 BLACK
L1
GREEN
G
29877.5 020413

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents