Operating Controls - Bunn DUAL SH DBC Installation & Operating Manual

.5 & 1.0 gallon
Hide thumbs Also See for DUAL SH DBC:
Table of Contents

Advertisement

OPERATING CONTROLS

F F
/ O
O N
H
I N
I T C
M A
S W
(a) MAIN ON/OFF SWITCH
This switch, located under the brewer behind the right front leg, turns power on and off to all components in
the brewer.
(b) BATCH SELECTOR SWITCHES
Pressing the switch corresponding to the Small, or Large batch selects the amount of coffee to be brewed.
Pressing a different switch after a brew cycle has been initiated does not change the brew batch in progress.
Light indicates the selected batch to brew.
(c) ON/OFF SWITCH (ENABLE BREW)
Pressing the ON/OFF switch alternately turns the brewing side on and off. Pressing this switch during the brew
cycle will interrupt the brew cycle, stopping the flow of water. Pressing this switch during the programming
of the brewer will exit the setup and return to the main screen.
(d) BREW SWITCH
Momentarily pressing and releasing this switch begins a brew cycle.
(e) PROGRAM SWITCH
Pressing and holding the upper right hidden switch allows entry to the programming menus. Pressing and
releasing the switch steps through each function screen during programming.
(f) FUNCTION SCREEN
This is the display which shows the various functions of the brewer and allows the programming to be ac-
complished.
(g) FUNCTION SCREEN SWITCHES
These are the hidden switches which are used to program the brewer.
(h) FUNNEL SENSING COILS
These are used to "receive" information from the Smart Funnel handle (coffee name and batch size), and also
from RECIPE CARDS.
(j) SCROLL BACKWARDS
The upper left hidden switch can be used to scroll backwards through the function list.
b
a
h
OPERATING CONTROLS
Page 6
f
g
j
d
c
e
d
h
c
29877.5 020413
b

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents