1. Remove the dust plug from the SFP, as shown in Figure 14.
763

Figure 14. Removing the Dust Plug from the SFP

2. Connect the fiber optic cable to the SFP port, as shown in Figure 15.
739

Figure 15. Connecting the Fiber Optic Cable

Powering On the
To power on the switch, perform the following procedure:
Switch
1. Plug the power cord into the AC power connector on the back of the
switch, as shown in Figure 16.