Unpacking The Switch - Allied Telesis AT-GS950/16 Installation Manual

Gigabit ethernet smart switches
Hide thumbs Also See for AT-GS950/16:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Chapter 2: Installation

Unpacking the Switch

32
To unpack the switch, perform the following procedure:
1. Remove all components from the shipping package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesyn.
2. Place the switch on a level, secure surface.
3. Ensure that the following hardware components are included in your
switch package. If any item is missing or damaged, contact your Allied
Telesyn sales representative for assistance.
One AT-GS950/16 or AT-GS950/24 Smart Switch and the following:
Two rack-mount brackets
Eight rack-mount bracket screws (black)
Four rack-mounting screws (stainless steel)
Four rubber feet (for desktop use)
One management cable
One power cord
Documentation CD

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-gs950/24

Table of Contents