Powering On The Switch; Figure 15. Plugging In The Ac Power Cord - Allied Telesis AT-GS950/8 Installation Manual

Allied telesis - websmart 8-port gigabit switch
Hide thumbs Also See for AT-GS950/8:
Table of Contents

Advertisement

Chapter 2: Installation

Powering On the Switch

46
To power on the switch, perform the following procedure:
1. Plug the power cord into the AC power connector on the back of the
switch, as shown in Figure 15.

Figure 15. Plugging in the AC Power Cord

2. Plug the other end of the power cord into a wall outlet.
Warning: Power cord is used as a disconnection device. To de-
energize equipment, disconnect the power cord.
Pluggable Equipment. The socket outlet shall be installed near
the equipment and shall be easily accessible.
3. Verify that the POWER LED is green. If the LED is OFF, refer to
Chapter 3, "Troubleshooting" on page 47.
The switch is now powered on and ready for network operations. For
information on how to manage the switch, refer to the AT-S107,
AT-S108, or AT-S109 Management Software User's Guide.
E3
E5

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-gs950/16At-gs950/24

Table of Contents