Travis Industries DVL GSR Insert Owner's Manual page 47

Hide thumbs Also See for DVL GSR Insert:
Table of Contents

Advertisement

Optional Equipment (for qualified installers only)
6
Remove the pilot orifice following the instructions below. Replace with the propane pilot orifice
Lift the pilot hood
a
off the pilot
assembly.
7
Replace the firebox components. Install the logs and embers. Replace the glass.
8
Carefully remove the control cover to access the stepper motor (see the illustrations below). The
stepper motor (adjustable regulator) has an installation sheet included with it – make sure to follow all
of the directions. Disconnect the wiring from the stepper motor. Remove the stock stepper motor
and replace with the LP version. – MAKE SURE IT IS CORRECTLY ORIENTED. Secure using the
screws included with the motor – tighten to 25 Lb-inches. Leak test this area after installation to
verify proper installation. Re-attach the wiring.
9
Make the gas line connection, bleed the gas line (if applicable), start the heater and thoroughly leak-
test all gas connections and the gas control valve.
© Travis Industries
Remove the orifice and replace with the LP orifice. Screw the
c
orifice all the way in and replace the pilot hood.
Use a hex wrench to
b
unscrew the orifice.
5/32" Hex
NOTE: when re-attaching,
this pin lines up with the
notch in the pilot hood.
4091008
47
Orifice Identification:
LP (Propane) Orifice
35
35
NG (Natural Gas) Orifice
62
100-01236_000

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Green smart dvl insert gsr

Table of Contents