Binding and RF Test
Allows you to bind or test sensors or actuators throughout the
system:
Binding will normally be performed with evotouch positioned
beside the actuator or sensor, for convenience.
RF Test is then used to check the communication performance
of all devices in their correct locations.
Heat Demand
Binds to the heat demand device:
Zone Binding
You are first prompted to specify the zone to bind:
You will then be prompted to bind one representative sensor and
one or more actuators to the selected zone.
Outdoor Sensor
Binds to the outdoor sensor:
RF Test Heat Demand
Tests the boiler heat demand:
RF Test Zones
You are first prompted to specify the zone to test:
You will then be prompted to perform an RF test to the selected
zone.
RF Test Outdoor
Tests RF communication with the outdoor sensor.
9