Installation Preparation - Haier HHX6130 User Manual

Haier ventilation hood user manual
Table of Contents

Advertisement

Available languages

Available languages

English

Installation Preparation

To install this range hood, you will need the following tools and materials:
Note: This procedure will require 2 people for easier installation.
Tools Needed for Installation
• Drill
• 1/8" Drill bit for drilling pilot holes
• 1-1/4" Wood bit for drilling electrical wiring access hole
• 3/8" Nut Driver or Ratchet with Extension
• Phillips head screwdriver
• Flat-head screwdriver
• Pliers
• Pencil, ruler and level for marking range hood location
• Hand saw or jig saw for cutting the wall or cabinet openings
• Duct tape
• Electrical tape
• Connector Clamp
General Preparation
Caution! Please be sure to turn the electrical power switch OFF before beginning
the installation.
1. Remove the range hood from the carton.
2. Lay the range hood upside down on a table covered with either cardboard or paper
to prevent scratching the hood or table.
3. Remove the 3 grease filters from the hood. Place them somewhere safe so they will
not be damaged.
4. Use only Halogen MR-16 type bulbs. (Not shipped with range hood.)
5. Remove the range hood's blower. Use a 3/8" nut driver or ratchet to remove the 4 nuts
holding it in position (Fig. 1). Place the blower and nuts somewhere safe until needed.
The wires to the blower are inside a housing. The top of the housing must be removed
first to get to the blower wires.
6. Turn the hood right side up so you can see the
duct knockouts and mounting holes.
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hhx6130ss

Table of Contents