Installation; Owner's Responsibilities - Blodgett COS-6 Installation And Operation Manual

Export series combi-oven/steamer
Table of Contents

Advertisement

Installation responsibilities prior to service
startup inspection
You are entitled to a free start-up inspection ser-
vice by our factory ASAP . Before a factory repre-
sentative arrives to perform a startup procedure,
the owner must already have satisfied the follow-
ing requirements.
1. Oven(s) are uncrated, stacked (if applies) and
put in place.
NOTE: Please refer to Leg Attachment and
Stacking.
Water
Water Pressure
Water Connection
Water Regulator Setting
Drainage
Drain Connection
Avg Water Drain Temp.
Model
KW/Section
COS-6
9.5
COS-101
18.5
COS-101S
18.5
COS-8E
18.5
COS-20E
61
PLUMBING
ELECTRICAL
Voltage
Phase
400/230
3
400/230
3
400/230
3
400/230
3
400/230
3
5

Installation

Owner's Responsibilities

MAXIMUM SHELF LOADING
COS-6
COS-101
COS-101S
COS-8E
COS-20E
276 kPa (40 PSI) minimum
345 kPa (50 PSI) maximum
19mm (3/4") Hose Cold Water
241 kPa static
Atmospheric Vented Drain
50.8mm (2.00") Copper
Approximately 50 (122_F)
Max Load (amps)
Frequency
(Hz)
(H )
L1
50
14
50
26
50
26
50
26
50
88
22,7 Kg (50 lbs)
22,7 Kg (50 lbs)
45,5 Kg (100 lbs)
45,5 Kg (100 lbs)
45,5 Kg (100 lbs)
L2
L3
14
14
26
26
26
26
26
26
88
88

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cos-101Cos-101sCos-8eCos-20e

Table of Contents