Set-Up; Set-Up Instructions; Tools Required - Graco GC-1412 Operation Manual

Graco inc. internal chop system operation manual
Table of Contents

Advertisement

Set-Up

or wall mount etc. should be completely assembled
before starting the following steps.

Tools Required:

3) Tape measure
All "Required tools" are standard sizes.
1.
Loosen clamp bolts to expose pump mounting
HEX BOLTS
19890-00
GC-1412D
2.
a. Stand the pump assembly next to the mast and
Lift to desired height with the pump assembly facing
the front of the cart as shown, approximately 41in.
from the top of the cart to the top of the pump mount-
possible.
41in./104 cm.
APPROX.
7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

20864-0521780-0122026-01

Table of Contents