5.4

Test Screens

These screens show the test procedure, either started from the service menu (front panel keys) or via the UPS
monitoring software (RS232/SNMP). The upper line indicates the kind of test, the second line its status.
Upper lines:
GENERAL SYSTEM
QUICK BATTERY
CALIBRATE BAT
BYPASS

5.4.1 Battery test, general

Automatic test: Every 500 operating hours the UPS conducts automatic battery tests to ensure that the
batteries and the wiring are able to support power failures. The tests do not cause any interruption in the
functioning of the unit.
Manual test: A manual battery test can be activated
-
either through an interface kit, via the RS232 or SNMP Interface Port (please refer to the
manual of your interface package), or
-
via the front panel: see below

5.4.2 Quick battery test

From the standard menu first enter the service menu (press the 'Down' and 'Enter/Reset' keys simultaneously,
then press the 'Down' key until the following screen appears:
QUICK BATTERY
TEST PRESS ENTER
The enter/reset key confirms the selection, and the screen shows:
QUICK BATTERY
TEST START
The test status (indicated by the second line) can be:
TEST ACTIVATED
TEST SUCCESSFUL
TEST FAILED
NOT AVAILABLE
If the batteries are dangerously close to being worn out, a low priority alarm 'replace battery' will be generated.
The batteries must be replaced as soon as possible (see section 8.3).
NOTE: If the manual test is started immediately after installation or after a power failure, the UPS may generate
a false 'replace battery' alarm as the batteries have been (partly) discharged during transport/storage or during
the power failure.
OPM_LPE_11X_3K0_10K_1GB_V041
second line:
TEST START
TEST ACTIVATED
TEST SUCCESSFUL
TEST FAILED
=
testing
=
battery has been tested with positive result
=
the batteries should be replaced
=
battery capacity too low to start the test
the test will start soon
the test is running
the test has been completed successfully
the test has not been completed successfully