Westerbeke 20B TWO Tehnical Manual page 50

Marine diesel propulsion engine
Hide thumbs Also See for 20B TWO:
Table of Contents

Advertisement

FRONT mark (arrow)
2. Installation of piston rings.
FRONT mark - - -.....
Rod front
--.------~
mark
Align notches -
accurately with
each other.
Tightening torque: ____
{O"\
3.2-3.5kg.m
\01
Installation of Piston Rings and Connecting Rod Cap
Westerbeke Engines
Pressing
Push rod
Connecting rod
', .....
~~--
Tool body
Ring set positions:
~
"r
mark and
d
OS size mark
No.1 ring.
No.2 ring.
oil ring
48
"r
mark and
OS size mark
OS size
identification
paint
Color of discrimination STO =Without color
O.25=White
O.50=Blue

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 20B TWO and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

30b three

Table of Contents