Advertisement

Questions? Email us at fireplaces@montigo.com or visit our website at www.montigo.com.
Installation
Operation &
Maintenance
C34-DV
Gas Fireplace
Check local codes
and
read
instructions prior to
installation.
Leave this manual
with the owner.
all

Advertisement

Table of Contents
loading

Summary of Contents for Montigo C34-DV

  • Page 1 Questions? Email us at fireplaces@montigo.com or visit our website at www.montigo.com. Installation Operation & Maintenance C34-DV Gas Fireplace Check local codes read instructions prior to installation. Leave this manual with the owner.
  • Page 2 C34-DV Gas Fireplace About the C34 Fireplace: Introduction C34-DV Installation DT - DR - DT-S - DR-S - How to use this manual: Warranty and Installation Information: Operation Maintenance Warranty Installations in Canada CAN/CGA B- Appendix 149.1 CSA C22.1 Installations in the USA ANSI Z223.1-...
  • Page 3 C34-DV Gas Fireplace Framing Vent Installation Figure 2. Figure 3. Figure 1. Clearances except the framed opening (C34-DR) 0" C34-DV (C34-DT) Minimum 1" clearance must still be maintained around the vent pipes. Top - Rear Vent* 7" Top - Top Vent 15"...
  • Page 4: Installation Requirements

    C34-DV Gas Fireplace Natural Gas Installation Requirements Propane Gas (5" / 8") Top Vent (4"/7") applicable installation codes Figure 5. Vent Terminations Selecting A Termination Location each appliance connection, Note: valve and valve train Appendix B DO NOT use a flame of any kind to test for leaks.
  • Page 5 C34-DV Gas Fireplace Installing Terminations with Built-In Frames Installing Heat Guards over Terminations PTO-3F PTKOG long Installing Terminations with MSR Frames PTO-3 Installing Terminations with MOSR Frames MOSR 12 12 PTO-3 Page 5...
  • Page 6 C34-DV Gas Fireplace Heat Shields Top Vent A) Through-The-Wall Installations The Venting Graph Figure 8. Available Top Vent Components C34-DV Top Example A: (Acceptable Installation) Vent Example B: (Acceptable Installation) Example C: (Unacceptable Installation) this would NOT be an acceptable installation.
  • Page 7 C34-DV Gas Fireplace Example 1: 150" max. (see 30" max. Figure 9a) Termination Rigid Section Solid Sections Exterior Wall Flex Section Hearth Figure 9a. Figure 10. Horizontal Venting 90° Elbow Solid Sections Rigid Section Termination Termination Flex Section Exterior Wall...
  • Page 8: Vertical (Through-The-Roof) Installations

    C34-DV Gas Fireplace B. Vertical (Through-The-Roof) Installations 5/8" with option for 4/7" Part Size 5"/8" Venting 4"/7" Venting A - Termination PVTK-1 MVTK-1 Figure 13b. B - Flex sections 12" length PFL-1 MFL-1 24" length PFL-2 MFL-2 36" length PFL-3 MFL-3 48"...
  • Page 9 C34-DV Gas Fireplace Storm collar 2' min. 2. 45° Corner Installation. Roof flashing Support straps or support plate & ring Firestop Termination Heat Shield 30' max. 30' max. Support plate & ring EXT-18 PXT-20 (cut to length) EEL-45 PEL-45 Elbow...
  • Page 10 C34-DV Gas Fireplace B. Multi-Elbow Installations Rear Vent installations: The Venting Graph Example A: (Acceptable Installation) NOTES: Example B: (Acceptable Installation) must Example C: (Unacceptable Installation) this would NOT be an acceptable installation. 18" 8" Figure 18b. 12 24 36 48 60 72 84 96 108...
  • Page 11: Fireplace Facing

    C34-DV Gas Fireplace Alkyd sealer Figure 19a Figure 19b Fireplace Facing Sheetrock/ Drywall MUST NOT BE OBSTRUCTED IN ANY WAY Header - to do so restricts the air supply for the control compartments and heat exchanger it also prevents access for servicing controls.
  • Page 12: Removing The Door

    C34-DV Gas Fireplace Wiring for the optional Fan Kit Removing the Door: Installations in Canada CSA C22.1 Installations in the USA (See figure 23a.) ANSI/NFPA 70-1987. Fan Kit Installation Guide NOTE: L1-WH L2-BLK Quick Connect Figure 23a. plug to motor Figure 22a.
  • Page 13 C34-DV Gas Fireplace Figure 23c. Re-installing the door: Figure 24b. Installing the Logs: C34-DV (See figure 25) Figure 25. Figure 24a. Page 13...
  • Page 14: For Your Safety Read Before Lighting

    C34-DV Gas Fireplace C34-DV with Continuous Pilot For Your Safety - READ BEFORE LIGHTING: WARNING: If you do not follow these instructions exactly, a fire or explosion may result causing property damage, personal injury or loss of life. B. BEFORE LIGHTING...
  • Page 15 C34-DV Gas Fireplace C34-DV-S with Pilotless (Spark-to-Burner) Ignition WARNING: B. BEFORE OPERATING What To Do If You Smell Gas: 1. STOP! STOP! Page 15...
  • Page 16 C34-DV Gas Fireplace counterclockwise clockwise Natural Gas Propane Gas any part has been under water Figure 26. C34-DV-I models (pilotless ignition) do not feature hi/lo adjustment. Page 16...
  • Page 17 C34-DV Gas Fireplace C38-DV-S A. Diagnosing the status using the indicator light. Power Generator Pilot Adjustment Screw Wall Switch LED Pattern Status Inlet Pressure Manifold Pressure Test Connection Figure 27 Sit Nova 820 (See figure 27.) figure 28). figure 30 Figure 28.
  • Page 18 Other Rights Other Rights Other Rights NOTE: Canadian Heating Products Inc. and/or Montigo DelRay Corp. reserves the right to make changes at any time, without notice, in design, materials, specifications, prices and also to discontinue colors, styles and products. Page 18...
  • Page 19 C34-DV Gas Fireplace A = clearance to the termination frame above grade, veranda, porch, deck, or M = clearance to mechanical air supply inlet balcony [16 inches (41 cm) minimum] [*6 feet (1.8 m) minimum] N = † clearance above paved sidewalk or a paved driveway located on...
  • Page 20 C34-DV Gas Fireplace Option A - Single Wall Switch Option B - Two Wall Switches for STB Control Only for STB and Fan Control Figure 29b.Wiring schematic for using two wall switches: one to control Figure 29a. Wiring schematic for using a single wall switch to control the the fireplace and a another to control optional fans for the fireplace.
  • Page 21 C34-DV Gas Fireplace Page 21...
  • Page 22 XG0117B Rev. 1 - 04/00 Canadian Heating Products Inc. Montigo Del Ray Corp.

Table of Contents